Permitting
Building inside the master plan means two review tracks in series: the Papagayo development's own architectural control board sets materials, massing and colour, and only then does the Carrillo municipal permiso follow. Most parcels sit on concession land in the maritime terrestrial zone, so the concession title and its build conditions govern before any drawing is stamped, and a SETENA filing is routine on the sensitive coastal frontage.